As part of Seabourn Quest's 2026 drydock programme, Trimline undertook a comprehensive redesign of the Spa & Wellness areas, transforming the spa lobby and Treatment Room 2 into spaces that better reflect the refined, restorative atmosphere guests expect aboard a vessel of this calibre. Every element of the refit was considered with the guest experience at its heart, from the moment of arrival through to the treatment environment itself.
The spa lobby received a striking new reception desk alongside a purpose-built storage shelf, providing both a polished front-of-house presence and the practical functionality required behind the scenes. New wall coverings were installed throughout — a meticulous process that involved the careful removal of existing finishes, thorough surface preparation, and the skilled application of a premium vinyl-backed covering to deliver a flawless, long-lasting result.
Newly installed back-lit mirrors bring a considered touch of warmth and luminosity to the space, whilst fresh blinds and sheers introduce softness and privacy, allowing light to be managed with elegance. A new storage unit completes the scheme, ensuring the space remains as practical as it is beautiful. The result is a spa environment that feels genuinely renewed — calm, cohesive, and wholly in keeping with Seabourn's signature standard of understated luxury.
Other work on this vessel included...
People
Days
Products
Tasks
Hrs Work
Value
Similar Projects... (Click to see more 'Spas/Fitness' examples)


